Assessment of Causes of Cost Overruns in Construction Projects in Uganda: A Case Study of Public Building Projects
Lugya Dacuan, Jjuko Edrine
| Journal | Metropolitan Journal of Engineering and Technology (MJET) |
| Volume / Issue | Vol. 5, No. 10 |
| Published | 09 November 2026 |
| ISSN | 3006-4368 |
Abstract
This study assessed the causes of cost overruns in public building projects in Uganda. A mixed design combined a relative importance ranking of ten perceived causes, based on 120 simulated practitioner responses, with a quantitative analysis of 140 simulated completed projects. Descriptive statistics, Pearson correlations, multiple linear regression and binary logistic regression were applied, with full diagnostic testing. Delayed payment of certificates, incomplete design at tender and variation orders were ranked as the three most important causes. The mean cost overrun in the simulated sample was 26.0 percent of the contract sum. The linear model explained 65.1 percent of the variance in overruns, with schedule delay, variation orders, incomplete design, delayed payment and delayed site possession increasing overruns and contractor experience reducing them. In the logistic model, incomplete design raised the odds of a substantial overrun 3.31 times. The study concluded that overruns originated mainly in weaknesses in project preparation, client-side payment performance and change management, and it recommended complete designs before tendering, timely payment and strict control of variations. All figures were simulated for illustration and do not describe real projects.
Keywords
cost overruns; public building projects; variation orders; project delay; construction; Uganda
Cite This Article
Lugya Dacuan & Jjuko Edrine (2026). Assessment of Causes of Cost Overruns in Construction Projects in Uganda: A Case Study of Public Building Projects. Metropolitan Journal of Engineering and Technology, 5(10). https://journals.miu.ac.ug/pages/article.php?article_id=1936
More in This Issue
View full issue →
1
Assessment of Construction Project Delays in Uganda: A Case Study of Selected Road Construction Projects
construction delays; road projects; right of way; payment delays; variation orders; contractor experience; Uganda
2
Assessment of Occupational Health and Safety Practices on Construction Sites in Uganda: A Case Study of Selected Building Projects
occupational health and safety; construction sites; building projects; safety training; inspections; accidents; Uganda
3
Assessment of Power Supply Reliability in Uganda: A Case Study of Selected Industrial Areas
power supply reliability; electricity outages; industrial areas; distribution network; feeders; maintenance; Uganda
4
The Effect of Climate Change on the Performance of Road Infrastructure in Uganda: A Case Study of Flood-Prone Roads
climate change; flooding; road infrastructure; drainage; culverts; resilience; Uganda
5
The Effect of Construction Materials Quality on the Performance of Road Infrastructure in Uganda: A Case Study of Selected Road Projects
road infrastructure; construction materials; pavement performance; quality assurance; aggregates; compaction; Uganda