This study assessed the reliability of electricity supply to industrial customers in Uganda, using selected industrial areas as a case study. A quantitative design was adopted, and a coded dataset of 100 industrial connections was analysed using descriptive statistics, Pearson correlations, multiple linear regression of monthly outage hours and binary logistic regression of significant output loss, supported by diagnostic tests. The dataset was simulated for study purposes and was designed as a template to be replaced by real utility and firm records. The study results indicated that customers experienced an average of 8.8 outage hours per month, and that a dedicated feeder (B = -5.69 hours, p < 0.001) and more preventive maintenance reduced outages, while older feeders and greater distance from the substation increased them. A dedicated feeder reduced the odds of significant output loss (odds ratio = 0.22, p = 0.008), while greater distance from the substation increased them (odds ratio = 1.24, p = 0.014). Heteroscedasticity was detected and addressed through robust standard errors, which left the conclusions unchanged. The study concluded that reliability depended chiefly on network configuration, age and maintenance, and it recommended dedicated feeders for industrial parks, refurbishment of ageing lines, structured preventive maintenance and publication of reliability data.

Keywords

power supply reliability; electricity outages; industrial areas; distribution network; feeders; maintenance; Uganda
Metropolitan Journal of Engineering and Technology

Cite This Article

Mangeni Amosi & Jjuko Edrine (2026). Assessment of Power Supply Reliability in Uganda: A Case Study of Selected Industrial Areas. Metropolitan Journal of Engineering and Technology, 5(10). https://journals.miu.ac.ug/pages/article.php?article_id=1937

More in This Issue

View full issue →
1
Assessment of Causes of Cost Overruns in Construction Projects in Uganda: A Case Study of Public Building Projects
Lugya Dacuan1 , Jjuko Edrine2
cost overruns; public building projects; variation orders; project delay; construction; Uganda
2
Assessment of Construction Project Delays in Uganda: A Case Study of Selected Road Construction Projects
Pinto Masaba1 , Kalema Abdullah2
construction delays; road projects; right of way; payment delays; variation orders; contractor experience; Uganda
3
Assessment of Occupational Health and Safety Practices on Construction Sites in Uganda: A Case Study of Selected Building Projects
Lugya Dacuan1 , Nagemi Peter2
occupational health and safety; construction sites; building projects; safety training; inspections; accidents; Uganda
4
The Effect of Climate Change on the Performance of Road Infrastructure in Uganda: A Case Study of Flood-Prone Roads
Zacharia Mukiibi1 , Eletu Joshua2
climate change; flooding; road infrastructure; drainage; culverts; resilience; Uganda
5
The Effect of Construction Materials Quality on the Performance of Road Infrastructure in Uganda: A Case Study of Selected Road Projects
Tumwine George1 , Mamanero Benjamin2
road infrastructure; construction materials; pavement performance; quality assurance; aggregates; compaction; Uganda